机械专业外文文献翻译
- 文件大小:1.64MB
- 浏览次数:
- 发布时间:2012-05-17
本资料包含doc文件1个,下载需要1积分
机械专业外文文献翻译
英文原文
High Productivity -A Question of Shearer Loader Cutting Sequences
K. Nienhaus, A. K. Bayer & H. Haut, Aachen University of Technology, GER
1 Abstract
Recently, the focus in underground longwall coal mining has been on increasing the installed motor power of shearer loaders and armoured face conveyors (AFC), more sophisticated support control systems and longer face length, in order to reduce costs and achieve higher productivity. These efforts have resulted in higher output and previously unseen face advance rates. The trend towards bigger and better” equipment and layout schemes, however, is rapidly nearing the limitations of technical and economical feasibility. To realise further productivity increases, organisational changes of longwall mining procedures looks like the only reasonable answer. The benefits of opti-mised shearer loader cutting sequences, leading to better performance, are discussed in this paper.中文译文
高效生产 - -个关于采煤机截割的次序的问题
1 摘要
目前, 地面下长壁采煤法致力于增加安装在采煤机和甲板输送机的电机功率, 以及更先进的支架控制系统和增加工作面长度,以达到减少费用和取得较高的生产效率的目的。这种努力已经造成较高的开支和先前未见过的设备费用增长速度。现在趋向于 "更大和更好" 的仪器和装备,然而这种趋势在技术上和费用上的可行性已经达到极限。为了要实现进-步促进生产力的增加,合理、有机地规范长臂采煤法的工序应该是解决提高生产效率问题的唯-的合理答案。在本文中论述了通过合理安排采煤机的截割次序以实现提高采煤工作效率。
2 简介
传统上,在地面下长壁采煤法操作方面,采煤机挖掘过程中,使用以下截割次序之-:反方向的或双方向的循环。除了这两种主要
- 1ASME规范碳钢及低合金钢材料(母材)低温冲击豁免的判断
- 2JR/T 0025.8-2005 中国金融集成电路(IC)卡规范 第8部分:与应用无关的非接触式规范
- 3GB/T 19472.2-2017埋地用聚乙烯(PE)结构壁管道系统 第2部分:聚乙烯缠绕结构壁管材
- 4矫直机三维模型SolidWorks模型设计
- 5桥梁图纸新规范预制箱梁全套CAD图纸
- 6模切机图纸
- 7轴承基本知识
- 8GB 5413.23-2010 婴幼儿食品和乳品中碘的测定
- 9静压管桩与压灌桩基施工组织设计
- 10TD75-500输送机图纸
- 11单片机原理与应用 第一章 单片机概述 PPT课件
- 12FZ/T 15001-2017 纺织经纱上浆常用变性淀粉浆料
- 13JJG石油 43-96 无线随钻测量仪
- 14弹性力学教材
- 15126.北京北护城河安定门闸深基坑支护方案的优化(摘录自《山西建筑》06年10期第91-92页)