基于精益制造与企业资源计划的材料定额方法研究
- 文件大小:332.97KB
- 浏览次数:
- 发布时间:2014-03-10
本资料包含pdf文件1个,下载需要1积分
The traditional material quota methods were analyzed. The material quota method and its workflow were proposed with the material synthesis cutting utilization rate. It is based on LP and ERP for optimization problems of raw material standard and material nesting cutting group. The material quota closed- loop synergizing control and management was researched. And the optimization solutions were proposed for material quota control and management workflow. An example was given about material quota control and management optimization. The application shows, the projects could improve the accu- racy, integration, synergy of the material quota process, and reduce the differenccs of the material quo- ta. Then the material quota control and management level could be enhanced.对传统材料定额方法进行分析,针对材料定额的原材料规格变化、下料组合变化的难题,提出了基于精益制造与企业资源计划的材料定额方法与流程解决方案,提出了材料综合下料利用率的方法。对材料定额的闭环控制、材料定额控制与管理协同等问题进行了研究,提出了材料定额的控制与管理流程优化解决方案。给出了材料定额控制与管理优化示例。运用表明上述方案可以提高材料定额的准确率、集成度、协同度,降低材料定额差异,提高材料定额控制与管理水平。
- 1GB 4926-1985 食品添加剂 红曲米
- 2WS/T 433-2013 静脉治疗护理技术操作规范
- 3第二章 Ecotect应用之一遮阳分析
- 4徐州市疾病预防中心实验楼电气设计施工图纸
- 5Q/SY JS0019-2003 陕京二线管道工程线路焊接施工几验收规范
- 6某工厂冰水主机空调系统整套设计cad施工图
- 7造船门吊大车运行机构HYC340CAD图纸
- 8GB/Z 22201-2016 接触器式继电器可靠性试验方法
- 9GB/T 5494-2019 粮油检验 粮食、油料的杂质、不完善粒检验
- 10复合载体夯扩桩施工技术
- 11河道疏浚工程施工方案
- 12中国财政博物馆建筑设计施工图纸(附效果图)
- 13纵向进给系统部件图
- 14GB/T 31934-2015 高辐射覆层蓄热量的测定与计算方法
- 15某综合楼基坑支护施工合同