填充泡沫铜对石蜡相变蓄热性能的试验研究
- 文件大小:256.44KB
- 浏览次数:
- 发布时间:2014-03-11
文件介绍:
本资料包含pdf文件1个,下载需要1积分
An experimental system was designed and established that paraffin was used phase change materials and copper foam as filled materials,experimental study was carried out on paraffin filled with copper foam and without filled with copper foam.The experiments used Agilent 34970A gather the data of the temperature,the temperature variation curves under various conditions were plotted and the results were discussed.The results indicates that the foam material will not only lead to a more uniform distribution of the temperature of thermal energy storage unit,but also shorten time of the charging and discharging processes on a large extent.以石蜡作为相变蓄热材料,泡沫铜作为填充材料加工制作了相变蓄热装置,并搭建了蓄热器热性能实验台,对填充泡沫铜和未填充泡沫铜的蓄热容器分别进行了相变蓄热试验,测量相变材料的温度并通过数据采集仪进行采集,整理绘制了在不同条件下的温度时间曲线并进行了分析讨论。结果表明泡沫铜的添加不仅使蓄热器内温度分布均匀,而且大大缩短了蓄热所需时间。
文件列表
正在加载...请等待或刷新页面...
发表评论
更多..相关推荐
更多..最近更新
- 12012年检测工程师考试(公共基础)专题培训
- 2S7-200-旋转工作台
- 3DB34/T 2470-2015 养老机构休养人员情绪沟通规范
- 4前车轮inventor设计
- 5园林规划
- 696EG404 120厚预应力混凝土空心板(跨度2.4米-4.2米 冷轧带肋钢筋)
- 7任意两坐标点间的距离计算
- 8钢筋工程量计算及钢筋抽筋方法
- 9工程项目成本核算问题研究
- 10jtt 27.2-1993 交通行业工人技术等级标准 公路运输与公路养护 超重型汽车列车驾驶员
- 11SZDB/Z 111-2014 建设项目施工环境监理技术指引
- 12工地生活区临时用水施工方案
- 13海淀区东升危改小区热力外线.热源由三期新建锅炉房市政热力外线工程施工组织设计
- 14GBZ 61-2015 职业性牙酸蚀病的诊断
- 15JB/T 8794-1998 计数继电器 电子式计数器