锅炉压力容器焊接和无损检测
- 文件大小:289KB
- 浏览次数:
- 发布时间:2017-03-10
本资料包含pdf文件1个,下载需要5积分
锅炉压力容器焊接和无损检测(英文)1.0 Scope..............................................................................................................2
2.0 Definitions......................................................................................................2
3.0 Codes and Standards....................................................................................2
4.0 Welding Documents......................................................................................4
5.0 Welding Procedure Specification (WPS).....................................................5
6.0 Welding Procedure Qualification Record(PQR).........................................7
7.0 Welding Performance Qualifications...........................................................9
8.0 Production Weld Test Plates........................................................................9
9.0 Acceptable Welding Processes (Fusion welding only)..............................9
10.0 Filler Metal Requirements...........................................................................10
11.0 Storage and reconditioning of welding materials....................................11
12.0 Dissimilar Weld Joints............................................................................11
13.0 Weld joint preparation, Welding Technique and Weld Design Details
(Including surfaces to beweld overlayed)................................................12
14.0 Single Side Welded Joints..........................................................................14
15.0 Weld contourand finish..............................................................................15
16.0 Repair Welding............................................................................................16
17.0 Preheating, Maximum Interpass Temperature and Interruption of
Welding........................................................................................................16
18.0 Post Weld Heat Treatment (PWHT)............................................................17
19.0 Inspection and Non Destructive Examination (NDE)................................20
20.0 Coordination / Supervision ofwelding.................................................24
21.0 Protection against Lamellar Tearing..........................................................25
22.0 Additional requirements for welding Titanium and Zirconium alloys.....25
- 1DB33/T 333-2014 毛竹笋用林栽培技术规程
- 2江苏某高层住宅群工程质量计划书(创优、创杯)_secret
- 3球笼式图
- 4某泵站纵面图
- 5GB/T 36236-2018 热熔胶贴标机
- 62012年 一级建造师 《工程管理》 第一轮面授【音频】第4讲
- 7西峡县红山大坝加固施工图
- 8广联达盗版提示红条补丁2013
- 9GB/T 10446-2008 滑动轴承 整圆止推垫圈 尺寸和公差
- 10GA基础图CAD图纸
- 11凸耳式三偏心蝶阀 28D371H300LB全套CAD图纸
- 12147782_全站仪视频教程之工程放样
- 13道路绿化组织设计包括路灯安装、园路铺装、给水等内容
- 14筛板式精馏塔设计课程设计
- 15脚手架工程