越障号”输电线除冰车
- 文件大小:16KB
- 浏览次数:
- 发布时间:2017-03-10
本资料包含doc文件1个,下载需要20积分
越障号”输电线除冰车
适用于学习交流挑战杯优秀作品巡展--越障号”输电线除冰车2012年10月25日 23:04:40
越障号”输电线除冰车
[摘要]:该输电线除冰车采用三悬臂结构,使装置能够稳定的悬挂在输电线上并完成行走、除冰及跨越障碍,其由过障机构、除冰机构、动力机构、电路控制与传感系统等部分组成。其有安全、节能、可跨越障碍、结构稳定等特点-始工作时:动力机构配合除冰机构完成除冰工作,遇到障碍通过,传感器自动检测,单片机控制自动完成跨越障碍,另配有远程邑,实现人工操作。
[关键词]:高压线覆冰分析;除冰机械;自动过障和远程控制。
[Abstract] :The transmission line de-icing truck with three cantilever structure, so that the suspension device to stabilize and complete the walk in the transmission line, de-icing and cross barriers, which had impaired by the agency, de-icing mechanism, dynamic organization, circuit control and sensing system and other components. He has a safe, energy saving, can cross barriers, structural stability and so on. Start work: power sector institutions with the completion of de-icing de-icing work through obstacles, sensors automatically detect, auto-complete single chip control across the barrier, comes with a remote control, to achieve manually.
[Keywords]: Analysis of high-voltage icing; de-icing equipment; automatically been impaired and remote control.
1 研制背景及意义
1.1 项目背景
冰冻灾害作为-种特殊的气象条件,在我们的生活中经常遇到,对农作物和基础设施的危害是很大的,特别是对电力系统的危害,曾给世界各地许多架空线路的安全运行造成严重影响,像美国、俄罗斯、法国、冰岛和日本等都曾先后发生严重冰冻灾害。又如,我国受大气候和微地形、微气象条件的影响,冰灾事故也频繁发生;2004 年12 月和2005 年12 月,我国部分地区500 KV 线路出现冰闪跳闸、导线舞动和倒塔断线事故,尤其是华中地区历史罕见的雨凇天气导致输电线路大范围覆冰、杆塔倒塌情况严重,直接影响了输电网的正常运行;2008 年初我国南方出现大面积降雪,据国务院新闻办发布的数据显示:冰冻灾害已造成浙江、江苏、安徽等19 个省(区、市)不同程度受灾,经济损
- 1BS EN 10168-2004 钢产品.检查文件.信息和描述表
- 2DB/T29-111-2018 埋地钢质管道阴极保护技术规程
- 3共享纸巾机优化版SolidWorks模型设计
- 4成都华侨城地产项目营销案例_90PPT
- 5GB/T 4985-2010 石油蜡针入度测定法
- 6某商住楼通风设计施工图纸
- 7100L真空乳化搅拌器罐底阀CAD图
- 8Study for reasonable value of friction coefficient between main cable and saddle
- 9XXXX高速公路施工总体组织设计
- 10格力多联(美兰办公大楼)中央空调设计施工图
- 11中关村生命科学园青年公寓工程——监理实施细则
- 12万吨选煤厂全套设计图
- 13蒸汽管道模型三维模型SolidWorks设计
- 14烨凤凰KTV包间室内装修设计施工图纸CAD
- 15XX外滩花园第一期会所室内精装修施工组织设计