红外壁障传感器制作
- 文件大小:70.89KB
- 浏览次数:
- 发布时间:2012-05-04
本资料包含pdf文件1个,下载需要1积分
红外壁障传感器制作Dallas Personal Robotics Group
IR Detector
By: Darren Sawicz
Original Documentation By: Jeff Koenig
his document is an update
reflecting the changes made to
Jeff Koenigs Infrared detector circuit.
The assembly code and circuit are
unchanged but the printed circuit
artwork and documentation have
been upgraded to make assembly
easier.
Theory of Operation
The PIC12C509 generates a 38 kHz
square wave, which delivers current
to the infrared LEDs. The infrared
energy is then reflected off of an
obstacle, if present, and is detected
by the Sharp IR receiver.
The program does the following:
1. Flash the 38 kHz square wave
through the Left infrared LED for
600 microseconds.
2. Check the Sharp detector – if it
detects IR light, go to step 3. If not,
go to step X.
3. Good! A reflection was detected.
But, it might be from another source,
so we wi ll turn off the Left LED and
see if the Sharp detector is still
seeing infrared illumination (from
another source).
4. Keep the Left infrared LED off for
600 microseconds.
5. Check the Sharp detector – there
shouldnt be any IR detected, since
we turned off the LED. If there is IR
detected, go to step X,
6. A valid reflection was detected, so
turn on the left LED (red) and bring
header pin 4 high. Skip to step 8.
7. No valid detection was made.
8. Return to step one, but this time
substitute right” for left”
The New Board
The new circuit board is smaller than
Jeff Koenigs original board. Each
new board measures 1.5" x 1". This
allows 16 small boards to be cut
from a single 4" x 6" board.
The original ASCII artwork showed
none of the component connections,
only component layout. I created a
schematic drawing of the circuit to
make it easier to see how the circuit
is connected. The schematic is
included on the last page.
T
- 1gbt 20315-2006 道路施工与养护设备 路面铣刨机 术语和商业规格
- 2JIS K3304-2006 Test methods for soaps
- 3给水聚乙烯管材标准
- 4岩土复杂边坡稳定分析软件 (土石坝)
- 5夏季养护
- 6s4写狗开发工具
- 7高速公路高边坡放样
- 8GB/T 18247.3-2000 主要花卉产品等级 第3部分 盆栽观叶植物
- 9钻拔叉顶部M22 螺纹孔的底孔
- 102009二级建造师执业资格考试大纲以及与2008大纲、教材对比
- 11高纤冷水塔施工组织设计
- 12高层结构施工图全套22层
- 13石狮某公司70x80钢结构厂房设计CAD图纸
- 14GB 29436.4-2015 甲醇单位产品能源消耗限额 第4部分:焦炉煤气制甲醇
- 15南京安监站安全文明施工管理资料一