中英文工程合同
- 文件大小:44.04KB
- 浏览次数:
- 发布时间:2022-05-13
本资料包含doc文件1个,下载需要1积分
第一条工程项目Article 1, Project item
1.工程地点: Project site:
2.工程范围: Scope of project
3.工程造价:人民币元整(该造价为包工包料价)
Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials)
第二条施工准备Article 2, Preparation for construction
1.甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。
Party A shall assists party B to dealwith the procedures of temporary hydropower andvertical transportation and provide architectural drawings and documents of relevant concealed obstacles.
2.乙方:. Party B:
①负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;
Be responsible for theworks of laying, management, use and maintenance of the temporary facilities,water and electricity pipeline in the construction area.
②组织施工管理人员和材料、施工机械进场;
Organize construction management staff and construction materials, construction machinery enter the Site.
- 12005年版简明建筑智能化工程设计手册 梁华 梁晨编
- 2JB/T 12049-2014 冶金烧结厂用圆筒造粒混料机
- 305涵管设计图
- 4LSY180螺旋输送机总装图
- 5DL/T 283.2-2012 电力视频监控系统及接口 第2部分:测试方法
- 6寻求钢结构住宅的突破
- 7商场全套建筑施工图
- 8某门窗工程投标书
- 9HG/T 3363-1987 W37-51红有机硅烘干电阻漆(原ZB/T G51087-87)
- 10HJ 906-2017 功能区声环境质量自动监测技术规范
- 11DB41/T 701-2011 褐蘑菇工厂化生产技术规范
- 12SJ 2829-1987 电视接收机用紧固件 十字槽大球面头螺钉
- 13CCGF 111.2-2008 淀粉制品
- 14GB 28476-2012 地毯使用说明及标志
- 15施工企业在竣工结算阶段的法律风险及防范