福特汽车公司发展产品质量规划(APQP)地位报告指
- 文件大小:584KB
- 浏览次数:
- 发布时间:2017-03-10
本资料包含pdf文件1个,下载需要5积分
福特汽车公司发展产品质量规划(APQP)地位报告指Ford Motor Company launched an Advanced Product Quality Planning Status
Reporting Guideline (APQP) Fast Start Initiative in December 1994. A cross-
functional APQP team formed to review the existing FAO Procedures and targe
best practices. The 1994 version of this document was created at that time, to
be in line with the AIAG Advanced Product Quality Planning and Control Plan
Manual.
Since that time, the external suppliers to Ford Motor Company, and internal
suppliers within Ford have used the FAO APQP Status Reporting Guideline to
monitor their own systems with regard to APQP.
With the experience that has been acquired since 1994, it has become
necessary to update this manual to reflect current practices, and successes. In
addition, the Ford Product Development System (FPDS) has become the
documented system for the Product Development processes within Ford
(replacing World Class Timing).
A cross-functional team was formed in 1999/2000 to review the 1994 FAO APQ
manual and practices, and this guideline has been updated to reflect generic
timing with respect to the FPDS system. It also contains references (at the tim
of publishing) to the FPDS Process Sheets. All of this is to clarify further the
appropriateness of the APQP process, and its direct tie to the existing
systems/process Ford currently has in place.
Furthermore, it is intended that the updated APQP process and FPDS timing
information will assist the external supply base in understanding the differences
between their own timing requirements, and those which need to be met by the
- 1DB31/30-2003 住宅装饰装修验收标准
- 2SB/T 10438.2-2008 摄影业服务规范 第2部分:摄像服务规范
- 3南通恒盛豪庭室外雨污水工程施工方案
- 4某地无梁楼盖厂房结构cad施工图
- 5河南某河道治理工程施工组织设计
- 6GB 7978-1987 纸浆 酸不溶灰分的测定
- 7电气常用数据手册
- 8GB 12913-1991 电容器纸
- 9房屋建筑工程造价管理
- 10GB/T 6002.4-1986 纺织机械术语 织机分类和术语
- 11桩基资料汇总
- 12CNAS-CL06:2018 实验动物饲养和使用机构质量和能力认可准则
- 13公路工程施工合同范本(交公路发[2009]221号)
- 14SJ 20777-2000 电子设计硬件描述语言VHDL
- 15建筑识图PPT