地铁铝合金端部结构组焊工装设计
- 文件大小:1.04MB
- 浏览次数:
- 发布时间:2014-03-12
文件介绍:
本资料包含pdf文件1个,下载需要1积分
Based on the analysis of the welding of the end structure of aluminum alloy metro,a new tooling for subway is designed for the actual use of the environment, and it was successfully used in the welding of Kunming number first subway line. The practical results prove that the tooling can meet the requirements of structural end welding, and make welding operation more convenient. The tolerances on dimensions and shape and position tolerance are qualified, locating dimensions reliable, clamping a solid, easy to operate and improve the efficiency. The design can meet the design demand.对地铁用铝合金端部结构的组焊工装进行了分析,结合地铁实际使用环境,设计了一种新型工装,并成功用于昆明一号地铁线的焊接。经实践证明,该工装满足了端部结构组焊的要求,焊接方便,尺寸公差和形位公差合格。
文件列表
正在加载...请等待或刷新页面...
发表评论
更多..相关推荐
更多..最近更新
- 1公路桥涵施工技术规范(JTG TF50-2011)正式版
- 2世纪广场绿化及环境设计总平面设计cad图纸
- 3隐蔽工程质量验收记录表
- 4GB 13308-1991 起重滑车安全规则
- 5旋风除尘器CY-1800(日本)
- 6HG/T 2301-1992 压缩空气用织物增强热塑性塑料软管
- 7基于铁谱的航空发动机图谱技术研究
- 8YY/T 0635.1-2013 吸入式麻醉系统 第1部分:麻醉呼吸系统
- 9酒店弱电施工设计图
- 10自行车轮step/stp格式
- 11SH 3115-2000 石油化工管式炉轻质浇注料衬里工程技术条件
- 12豪华游轮SW2011模型
- 13曲轴工艺基础知识
- 14住宅楼分户计量地暖采暖图
- 15万向轮